The construction of the Molynor Industrial Complex, located in the port of Mejillones, in the Second Region of Chile, was begun in 2008 and it is to be fully operational by January 2010.

Its installed capacity is 60 million pounds of molybdenum a year.

The Board of Directors of Molynor is made up of John Graell Moore in the role of president, with the remaining directors being Gonzalo Concha, Gonzalo Bascuñan, Jorge Ramírez, Francisco Fernández, Manuel Guzmán, Fernando Ortega, Fernando Alliende y Rafael Raga. Its managing director is Fernando Rodriguez and its operation is under the management of Carlos Johnson.

Camino Nos a Los Morros N° 66, San Bernardo, Chile  +(56-2) 2937 6600 +(56-2) 2937 6600  +(56-2) 2937 6653 +(56-2) 2937 6653  info@molymet.cl info@molymet.cl

Warning: fsockopen() [function.fsockopen]: unable to connect to 193.0.6.135:43 (A connection attempt failed because the connected party did not properly respond after a period of time, or established connection failed because connected host has failed to respond. ) in C:\AppServ\www\molymet\components\com_joomlastats\count.classes.php on line 1078

Warning: fsockopen() [function.fsockopen]: unable to connect to 200.3.14.10:43 (A connection attempt failed because the connected party did not properly respond after a period of time, or established connection failed because connected host has failed to respond. ) in C:\AppServ\www\molymet\components\com_joomlastats\count.classes.php on line 1078

Warning: fsockopen() [function.fsockopen]: unable to connect to 196.216.2.130:43 (A connection attempt failed because the connected party did not properly respond after a period of time, or established connection failed because connected host has failed to respond. ) in C:\AppServ\www\molymet\components\com_joomlastats\count.classes.php on line 1078